Stabilize 2:1
slope between two parking lots with
out curbs
and without vegetating
Sheet flow from upper lot has caused
rill erosion even with
lockdown netting
Protect catch basin in street from
non-point source pollution
Northeast Environmental Solution
Install An Ecoberm
at the top of the slope to buffer runoff
from the upper lot
Apply a 2" Ecoblanket on the slope
Terraseed areas near road
Install Filtrexx Socks along road